Dangote Cement Engineering Competition at a Glance
Dangote Cement undergraduate engineering competition has opened for Nigerian students.
- Teams must have 2 to 4 undergraduate engineering students.
- Each team will choose one challenge track.
- Total prize fund is ₦1,500,000.
- Registration closes on 16 July 2026.
- Entry is through the official registration portal.
Read on for eligibility, challenge tracks, deliverables, prizes and how to register.
Dangote Cement Plc has sponsored the inaugural Industry-Based Engineering Research Competition for undergraduate engineering students in Nigeria.
The competition is organised by the Academic & Research Board, ARB, of the University of Lagos Engineering Society, ULES and it is open to teams of undergraduate engineering students who will design practical, evidence-based solutions for real cement manufacturing problems.
What Is the Dangote Cement Undergraduate Engineering Competition?
The Dangote Cement Plc Undergraduate Industry-Based Engineering Research Competition is an industry-based challenge for university engineering students.
The competition, also called the DCP University Engineering Challenge, will require teams to choose one of four challenge tracks, diagnose the problem and present an engineering and business case for a workable solution.
Who Is Sponsoring and Organising the Competition?
The competition is sponsored by Dangote Cement Plc.
It is organised by the Academic & Research Board of the University of Lagos Engineering Society.
Why Is the Challenge Connected to Cement Manufacturing?
The challenge is based on real operational problems connected to cement manufacturing.
Dangote Cement Plc operations include plants at Obajana, Ibese, Gboko and Okpella and the competition has been set up to connect academic engineering work with plant-level industry needs.
Who Can Apply?
The competition is open to currently enrolled university engineering students.
Teams should meet the following conditions:
- Members must be currently enrolled university students studying an engineering discipline.
- Each team must have two to four members.
- Multidisciplinary engineering teams are encouraged.
- Each team must select one of the four challenge tracks.
- Each team must submit original work only.
- Presenting another team’s work is grounds for disqualification.
No prior cement industry experience is required and the brief for each challenge track provides the required context for participation.
What Will Teams Submit?
Each team will develop an impactful research deck based on its chosen track.
The final submission will include:
- A 10-slide executive presentation
- A technical appendix or model/prototype, where applicable
- A one-page business case showing value, cost, assumptions and risks
- A simple roadmap covering immediate, short-term and medium-term actions
- A risk and safety assessment relevant to the proposed solution
- A statement of assumptions and data limitations
What Is the Recommended 10-Slide Pitch Format?
The executive presentation should follow this structure:
- Challenge selected and why it matters to DCP
- Current-state problem diagnosis
- Data/exhibit insights and key assumptions
- Root-cause hypothesis
- Proposed engineering/business solution
- Technical feasibility and operating concept
- Business case and expected impact
- Risk, safety, sustainability and mitigation plan
- Roadmap and resources required
- Final recommendation and pilot proposal
What Are the Four Challenge Tracks?
Each team will select one challenge track.
All four tracks are weighted equally, so each team should choose the track that best matches its strengths and engineering disciplines.
Challenge 1: Alternative Fuel Sourcing and Pricing Optimisation
What Is the Problem Statement?
Dangote Cement Plc wants to improve alternative-fuel use in its cement kilns, but sourcing, cost, consistency, quality, logistics and handling can be difficult.
Teams are expected to identify feasible alternative-fuel streams within Nigeria and design a sourcing model that can deliver reliable, safe and cost-competitive fuel to selected cement plants.
Why Does This Matter to DCP?
Alternative fuel supports the thermal substitution rate, fuel-cost control, sustainability, circular-economy impact and CO₂ reduction.
This track is relevant where TSR is below target and where fuel availability or price competitiveness limits kiln substitution.
What Should Teams Deliver?
Teams choosing this track should provide:
- Alternative-fuel opportunity map by location and fuel type
- Cost-per-ton and basic energy-value comparison
- Recommended top three alternative-fuel options with justification
- Pilot roadmap, risk register and mitigation plan
- Business case showing expected value to DCP
Recommended disciplines include Chemical Engineering, Mechanical Engineering, Civil & Environmental Engineering and others.
Challenge 2: Predictive Maintenance and Reliability Early-Warning System
What Is the Problem Statement?
DCP plants run several critical equipment systems, including crushers, raw mills, coal mills, kilns, cement mills and packing equipment.
Unplanned failures and repeat stoppages reduce plant reliability, throughput and cost performance, so teams are expected to design a practical early-warning model that predicts or flags high-risk equipment before major failures occur.
Why Does This Matter to DCP?
Reliability is a recurring operational priority.
A practical predictive system will help maintenance and operations teams prioritise inspections, reduce repeat failures, improve root-cause-analysis discipline and protect production output.
What Should Teams Deliver?
Teams choosing this track should provide:
- Reliability early-warning framework
- Risk-scoring model with clear assumptions
- Dashboard mock-up or prototype
- Example maintenance escalation workflow
- Plant-use roadmap
Recommended disciplines include Mechanical Engineering, Electrical Engineering, Mechatronics, Computer Engineering and others.
Challenge 3: Cement Production Conversion Gap
What Is the Problem Statement?
A cement plant may have clinker available or may record reasonable clinker production, yet still miss cement production targets.
Teams are expected to diagnose why clinker strength does not always translate into cement output and design a conversion-loss bridge that separates rate, runtime, feed, additive, packing, dispatch and planning constraints.
Why Does This Matter to DCP?
Cement production is not only a kiln issue.
Output depends on mill availability, grinding rate, product mix, additive availability, silo space, packing capacity, dispatch readiness, power availability and production planning.
What Should Teams Deliver?
Teams choosing this track should provide:
- Clinker-to-cement conversion framework
- Loss tree or loss-bridge template
- Dashboard mock-up for daily plant review
- Root-cause hypotheses for typical conversion losses
- Action plan with owners by system
Recommended disciplines include Mechanical Engineering, Chemical Engineering and others.
Challenge 4: Digital KPI Automation and Data Quality
What Is the Problem Statement?
DCP plant-performance reporting depends on timely and accurate daily, monthly and year-to-date KPI data.
Manual reporting increases the risk of delays, inconsistent templates, missing numbers and weak traceability, so teams are expected to design a digital KPI reporting and validation concept that improves data quality, exception visibility and management decision-making.
Why Does This Matter to DCP?
Accurate data supports plant-performance improvement.
This track supports faster reporting, better governance, fewer manual errors, standard KPI definitions and improved visibility across Obajana, Ibese, Gboko and Okpella.
What Should Teams Deliver?
Teams choosing this track should provide:
- KPI data model and reporting workflow
- Validation rule library
- Exception dashboard or wireframe
- Plant sign-off and escalation process
- Roadmap using Excel, Power BI, Power Apps, Python or other suitable tools
Recommended disciplines include Computer Engineering, Systems Engineering, Electrical/Electronic Engineering and others.
What Are the Prizes?
Awards will be presented to the top teams at the end of the challenge.
The total prize fund is ₦1,500,000 and prize details are listed as follows:
- 1st Place: ₦700,000 and certificate
- 2nd Place: ₦500,000 and certificate
- 3rd Place: ₦300,000 and certificate
Prize details will be confirmed by the organising team before the final pitch.
How Will Teams Register?
Teams are to register through the official DCP University Engineering Challenge registration portal.
During registration, each team will indicate its chosen challenge track.
When Is the Registration Deadline?
Registration closes on 16 July 2026.
Late entries will not be accepted, so eligible teams should complete registration before the closing date.
What Should Teams Prepare Before Registration?
Teams should confirm their members, choose one challenge track and agree on the proposed research direction before filling the registration form.
Each team should also ensure that its submission will be original, since presenting another team’s work is grounds for disqualification.